[Option I] (In case of a lump-sum payment)

If the Licensor fails to deliver the Technical Documentation in time as stipulated in Annex 2 to the Contract and Article 9.5 above, Licensor shall pay penalty to Licensee for late delivery of the Technical Documentation at the following rates:

(1) ____ % (______ percent) of the total contract fee for each week of late delivery from the first week to the fourth week;

(2) ____ % (______ percent) of the total contract fee for each week of late delivery from the fifth week to the eighth week;

(3) ____ % (______ percent) of the total contract fee for each week of late delivery exceeding eight weeks.

The above-mentioned total penalty shall not exceed ___% (____percent) of the total contract fee, any fractional week of late delivery shall be counted as one week.

[Option II ] (In case of initial fee and running royalty)

If Licensor fails to deliver the Techni

9.6
[选项] (在案件一整笔付款)

如果许可不能提供的技术文件,在时间的规定,在附件2合同和第9.5以上的,许可人应支付罚款,以持牌人延迟交付的有关技术文件如下:

( 1 ) ____ % (______ % )的合同总费用为每星期的延迟交付的,从第一周的第四个星期;

( 2 ) ____ % (______ % )的合同总费用为每星期的延迟交付的,从第五周向第八周;

( 3 ) ____ % (______ % )的合同总费用为每星期的延迟交付超过八个星期。

上面提到的罚款总额不得超过___ % (____ % )的合同总费用,任何分数一周的延迟交付的,应算为一周。

[备选方案二] (在案件的初步费用和运行的专营权费)

如果许可不能提供的技术文件,在时间的规定,在附件2合同和艺术9.5以上的,许可人应支付罚款,以持牌人延迟交付的技术文件如下:

( 1 ) ____ (说:______ ) [货币]为每星期的延迟交付的,从第一周的第四个星期;

( 2 ) ____ (说:______ ) [货币]为每星期的延迟交付的,从第五周向第八周;

( 3 ) ____ (说:______) [货币]为每星期的延迟交付超过八个星期。

上面提到的罚款总额不得超过__________ [说] ___________ [货币] 。任何分数一周的延迟交付的,应算为一周。

9.7刑罚所作出的许可,以持牌人根据第9.6以上不得释放许可从它有义务继续提供技术文档。

9.8如果提供可观的部分许可人的技术文档-体是延误超过6 ( 6 )个月,持牌人应有权终止合约,在按照第14条第( 1 )。在此类终止许可应返回持牌人的总金额,其中持牌人已支付的加____ %的利息,每半年就此和支付违约赔偿金金额为__________ (说_____) (货币) 。

9.9 [选项]