求英文翻译~!!!

来源:百度知道 编辑:UC知道 时间:2024/07/02 04:54:33
外接线的安装:1. 红线――连接脚防护板左边保险丝合中(红电线也可连接保险丝后再插入使之导通),取得时间用的电源
2. 桃红线――与高压圈桃红线连接,取得转速讯号(穿过脚防护板,右下护侧条至高压线圈)若CDI有改装请接右下侧条及后置脚下方处的

External line installation: 1. Red line - to connect to the left foot protective plates fuse together in the (red fuse wire connections can then be inserted to make it turn-on), time to get used to power
2. Pink line - and pink ring of high pressure line connection speed is achieved (through the protection board feet, retaining the lower right side to be high-tension line circle) if CDI has requested the conversion and then the lower right side of the square at the foot of the post office