急!有没英语专业的帮我翻译下面的英文啊,万分感激

来源:百度知道 编辑:UC知道 时间:2024/06/28 17:08:24
- Methods are required for measuring the quantity and the quality of the output
- Set points and standards are needed with which the desired quality and quantity of the output can be compared unambiguously.
- Means are needed for controlling the process or its input in order to be able to adjust the output.
As a building management system is in fact an information processing system, it should provide functions for data input, processing this data into information and get the results as output to the operator.
When we start considering energy conservation through building management we will examine all the facilities involved in meeting the above conditions. We have to achieve the desired output with the optimization of the equipments involved in giving us the necessary inputs. We will look at the available new control products and improvements that might contribute to achieve our desired goal.
Energy conservation begins with the basics l

- Methods are required for measuring the quantity and the quality of the output 测定输出数量和质量所需的方法
- Set points and standards are needed with which the desired quality and quantity of the output can be compared unambiguously. 设定具体的点和标准有助于清晰地与输出的期望数量和质量进行对比。
- Means are needed for controlling the process or its input in order to be able to adjust the output. 需要控制过程或输入的方法以便可以调整输出值。
As a building management system is in fact an information processing system, it should provide functions for data input, processing this data into information and get the results as output to the operator. 由于建筑管理系统实际上是一种信息处理系统,这就应当为数据输入提供一些功能,将数据处理为信息然后作为输出结果提供给操作人员。
When we start considering energy conservation through building management we will examine all the facilities involved in meeting the above conditions. We have to achieve the desired output with the optimization of the equipments involved in giving us the necessary inputs. We will look at the available new control products and im