2. Swatch Folders and Bulk Raw Material Ordering for ALL Purchase Orders
3 sets of Production swatch folders that include all production quality fabrics, trims and hardware by PO must be prepared for approval. 1 set is to be sent to the Production Coordinator of the Randa Luggage Design Department in Totowa-NJ, 1 set is to be sent to the RLHZ China office and the last set to be kept by the factory as soon as the order has been confirmed by e-mail to the factory. The set kept by the factory and by the RLHZ China office is for recordkeeping and inspection reference. Preproduction (PP) samples are to be made upon satisfactory approval of the swatches by the RLNJ office and sent to the RLNJ office for approval.

In regards to bulk material purchasing, the factory with RLHZ China office oversight will carry out 100% inspections of the raw materials to assure that acceptable quality materials are being used in the production. Any problems or delays with the raw material: fabri

2。样本文件夹和散装原料订购的所有采购订单
3套生产样本文件夹,包括所有生产优质面料、辅料和硬件由博必须准备批准。一组被送到了生产协调员的Randa设计部门在Totowa-NJ行李,一组是被送到RLHZ中国办公室,最后一个是由工厂一旦订单已证实,由电子邮件给工厂。这个设置将由RLHZ中国工厂,办公室和检验记录为参考。试产(PP)样品必须在批准的满意的办公室和RLNJ样本送到RLNJ办公室批准。

对于散装材料采购、工厂和RLHZ中国办公室将进行100%检验疏忽的原料,保证质量可以接受材料被用于生产。任何问题或延迟与原料:织物、手推车或其他材料/组成的,须报经RLHZ中国办公室和质保经理办公室在RLNJ至少62天前出厂截止日期。

我们认识到影响的组件可以交货的及时的生产进度。一旦RLNJ和RLHZ中国办公室的通知》(生产)特定任何送货问题至少62天ex-China前出货日期,RLHZ中国队将试图解决这个问题与原料供应商。

3。试产样初始为所有的程序
供应商必须发出了一套完整的试产样Randa新泽西办公室行李,经批准的样本文件夹,但不得迟于48天前关闭出货日期。出厂这个RLNJ办公室会指出任何问题之前,需要修正。

一旦样品已经signed-off页的RLNJ团队、供应商也应该做一套复制页,第一个装运到RLHZ样品,RLHZ中国驻中国办公室将sign-off寄回给工厂从RLNJ一经确认。在原材料、过程及最后的检查,RLHZ中国队将经常指生产样本文件夹,签下了样品质量基准和聚丙烯相比。

负责运费付款的工厂在产前样送到RLNJ办公室。

4。工厂生产会议
每个供应商必须有一个试产会议至少36天前出厂截止日期。RLHZ中国办公室需要被通知4个工作天前会议的供应商。这次会议的目的,看看是否有问题可以讨论之前,第一个生产开始运送所有的程序。中国的RLHZ办公室将证实在返回出席这次会议。失败的RLHZ通知中国将有关会议的50美元罚款美金。