Things aren't going as well as ____(选择:plans,planned,planning并说明原因)

来源:百度知道 编辑:UC知道 时间:2024/09/20 21:37:40

答复如下:
选planned(过去分词),表被动。
全句的意思是:情况(进行得)没有计划的那么好。

planned

Things aren't going as well as (which was) planned. 括号内为省略成分,

表示“已经计划的”,所以用过去式。

planned
as well as planned 情况进行得并不如计划的那么好。

planed 被动所以用planed