拜托帮翻译句话 谢谢了

来源:百度知道 编辑:UC知道 时间:2024/07/02 10:18:42
凉山水电站建设移民少,淹没少,基本没有航运和交通干扰,工程造价低,建设周期短

The Luongson hydroelectric power station constructs the immigrant few,submerges few, basically does not have the shipping and the trafficinterference, the project construction cost low, the constructioncycle is short

The cool landscape electricity stands to constuct immigrate little, drown little, basic have no shipping and transportation interference, the engineering builds price low, constuct a period is short