求求各位给翻一下吧 又急用啊

来源:百度知道 编辑:UC知道 时间:2024/09/20 14:28:13
在凉山建设相同装机容量的电站,工程成本比内地低水头大流量电站造价低40%—50%,建设工期短30%—40%,电站年利用小时数平均在5500小时以上。

Constructs the same installed capacity in Luongson the power plant, the project cost compared to inland low flood peak great current capacity power plant construction cost low 40%-50%, construction time limit for a project short 30%-40%, power plant year use hourage average above 5500 hours.

In Liangshan power plants with installed capacity of the same building, the cost of the project than the low head and large flow of power station construction costs low 40% -50%, the construction period short 30% -40%, power plants, the average number of hours used in 5,500 hours above.