The interior of the Centre also makes a strong impression
In July 2003, the consortium of Arup, architecture firm PTW, the CSCEC (China State Construction and Engineering Corporation) and the CSCEC Shenzhen Design Institute (CSCEC+DESIGN) won the international design competition for the National Aquatics Centre for the 2008 Beijing Olympics.
The competition, which was judged by a panel of international architects, engineers and pre-eminent Chinese academics, commenced with submissions from ten international consortia and also involved a public exhibition and vote.
The Water Cube looks set to be ready in October 2007. Both the concrete and the steel structure have been completed, and 500 m² of prototype cladding was installed in April, 2006. The next phase is to install all of t
国家水上运动中心,被称为'水立方' ,将是一个最引人注目和令人振奋的场地特征的体坛盛事,为2008年北京奥运会。
该中心的内部,也使得一个强烈印象:
2003年7月,该财团的工程顾问,建筑设计公司ptw ,建筑(中国国家建设和工程公司)和深圳市建筑设计研究院(建筑+设计) ,赢得了国际性的设计比赛,为国家水上运动中心,为2008年北京奥运会。
竞争,这是判断的评审团由国际建筑师,工程师及前著名华人学者,展开与意见书,由十个国际财团,也涉及公共展览和表决。
水立方看来也会随时准备在2007年10月。无论是混凝土和钢结构已经完成, 500平方米的原型板被安装在2006年4月。下一阶段的工作是安装所有的包层,然后再跟进就与德propping内部结构和完善的内部。
该建筑的结构设计是基于对自然形成的肥皂泡
到达该建筑的结构设计,是基于对自然形成的肥皂泡给予一个随机的,有机的外观,我们常用的研究方法,由weaire和phelan (教授,物理系)到如何利用肥皂泡沫可能会被安排在一个无限阵列。
把设计到生活中,个别气泡被纳入一个塑料薄膜,并适合像一个缝纫格局。整整一节是拼凑起来的,然后付诸到地方内部结构。有内部和外部的电影,和电影,然后膨胀,一旦它在原位。它会不断抽水。
实际抽水已分段承包,一旦安装完成后,经营者必须既负责操作和维修的幌子,为十年。这是一个关键组成部分,言简意赅,在选择承包商。
该项目是一个机会,为我们提供了我们的专业知识在永续服务。建筑将采用太阳能加热游泳池和室内面积,而所有反冲洗水是经过过滤和回到泳池。
该计划与设计该项目是在澳大利亚。该项目现在已经移交给一个团队,在北京的人,照顾施工。
国家水上运动中心,即是 '水立方',将会是最戏剧性的而且最令人兴奋的举办地点之一在 2008 年为北京奥林匹克以喜好运动的事件为特色。
中心的内部也作强烈的印象
在 2003 年七月, Arup 的协会, 建筑学公司 PTW 、 CSCEC(中国州工程和工程公司) 和 CSCEC 深圳设计学会 (CSCEC+设计) 嬴得了国际的设计竞争为国立水生动物中